Thurston

Thurston

The first phase of sixty-two Apartments completed 2014 on a multi-storey steel frame. Challenging geometry, close proximity to a railway, on a contaminated brownfield site, overlying an aquifer, and in a flood plain.

Following remediation, the engineering solution comprised piled foundations, the formation of compensatory wash areas, ground gas protection measures and a braced steel frame construction.